
Diamond Drill Results April 2013

Proposed 2013 Exploration Program

Diamond Drilling Program
January 2013

2012 Termite Mound Geochem Survey Results

November 2012 RC Drilling Program Bambadinka Trend

October 2012 Diamond Drilling Program Siribaya Structure

2012 RC Drilling Program

2012 Diamond Drilling Program

November 2011 RC Drill Program - All Results

November 2011 RC Drill Program - Current Results

October 2011 Diamond Drill Results

Sept 2011 Diamond Drill Results

Sept 2011 RC Drill Results

July 2011 Auger Drill Results

Representative Cross Section of the Siribaya Deposit: 36+60 N

Representative Cross Section of the Siribaya Deposit: 39 + 00 N

July 2011 RC Results

Representative Cross Section of the Siribaya Deposit: 39 + 40 N

Representative Cross Section of the Siribaya Deposit: 39 + 80 N

July 2011 Diamond Drill Results

2011 Auger Drilling Results

Map of Permit Area

Map of Resource Area

Geochem (2005-2006)

RAB Drilling (2007)

Diamond Drilling (2008)

Diamond Drilling (2009)

Airborne Magnetic Spectrometer Survey with Geochem (2010)

Termite Mound Geochem - Siribaya Structure (2010)

RC Drill Results (2010)